Design activities
GSL No. 007316
Issued 23.12.2019 · Urban Planning Control Department of Almaty
Open the licence (PDF) ↗Service · 04
Design of external water supply, sewerage, heating, power and telecommunications networks, and outdoor lighting. Diversion and relocation of existing utilities within project boundaries.
Projects with positive expert review conclusions: 6.
| No. | Project | Year | City | Level | Expert review conclusion |
|---|---|---|---|---|---|
| 01 | Roads and utility networks in the Telman residential area, Phase 3. Design revision | 2023 | Astana | II | 01-0224/23 dated 01.06.2023 |
| 02 | Major rehabilitation of on-site utility networks at the Border Academy of the National Security Committee of Kazakhstan | 2023 | Almaty | II | 18-0010/23 ДСП |
| 03 | Roads and utility networks in residential areas. Koktal-1 settlement, Phase 2. Design revision | 2024 | Astana | II | 01-0105/24 dated 11.03.2024 |
| 04 | External utility networks for the KIA factory in the Kostanay industrial zone | 2024 | Kostanay | II | 12-0245/24 dated 19.06.2024 |
| 05 | Roads and utility networks in residential areas. Zheleznodorozhny residential area. Design revision | 2025 | Astana | II | 01-0345/25 dated 28.08.2025 |
| 06 | Roads and utility networks in residential areas. Dostyk settlement. Completion of construction, Phase 1 | 2026 | Astana | I | 01-0099/26 dated 18.03.2026 |
Project titles are abbreviated and translated for reference. Conclusion numbers and dates are taken from the company portfolio.
How we work
We receive the design brief, permits and technical conditions, analyse the available materials and define the scope of work.
We carry out geodetic, geotechnical and hydrometeorological surveys and inspect existing structures and utilities.
We develop design and working documentation in a single information model with clash control and coordinate solutions with stakeholders.
We support the project through the state comprehensive expert review until a positive conclusion is issued and hand over the documentation package to the client.
GSL No. 007316
Issued 23.12.2019 · Urban Planning Control Department of Almaty
Open the licence (PDF) ↗Development of design and working documentation in the scope and order set by SN RK 1.02-03-2011: plan, longitudinal and cross sections, subgrade, pavement, drainage, structures, traffic management, utility networks.
SN RK 1.02-03-2011The company holds licences for IndorCAD, Topomatic Robur and ABC-4.
We will prepare a commercial proposal for survey and design work.