Utility network and outdoor lighting design

Design of external water supply, sewerage, heating, power and telecommunications networks, and outdoor lighting. Diversion and relocation of existing utilities within project boundaries.

37projects with positive expert review
8Level I responsibility facilities
5cities in Kazakhstan

Scope of work

  • 01External water supply networks
  • 02Sewerage
  • 03Heating networks
  • 04Power supply
  • 05Telecommunications networks
  • 06Outdoor lighting
  • 07Diversion and relocation of existing utilities

Completed projects in this field

Projects with positive expert review conclusions: 6.

No.ProjectYearCityLevelExpert review conclusion
01Roads and utility networks in the Telman residential area, Phase 3. Design revision2023AstanaII01-0224/23 dated 01.06.2023
02Major rehabilitation of on-site utility networks at the Border Academy of the National Security Committee of Kazakhstan2023AlmatyII18-0010/23 ДСП
03Roads and utility networks in residential areas. Koktal-1 settlement, Phase 2. Design revision2024AstanaII01-0105/24 dated 11.03.2024
04External utility networks for the KIA factory in the Kostanay industrial zone2024KostanayII12-0245/24 dated 19.06.2024
05Roads and utility networks in residential areas. Zheleznodorozhny residential area. Design revision2025AstanaII01-0345/25 dated 28.08.2025
06Roads and utility networks in residential areas. Dostyk settlement. Completion of construction, Phase 12026AstanaI01-0099/26 dated 18.03.2026

Project titles are abbreviated and translated for reference. Conclusion numbers and dates are taken from the company portfolio.

Register of all 37 projects

How we work

From input data collection to a positive expert review conclusion

01

Input data collection

We receive the design brief, permits and technical conditions, analyse the available materials and define the scope of work.

02

Engineering surveys and inspection

We carry out geodetic, geotechnical and hydrometeorological surveys and inspect existing structures and utilities.

03

Design and BIM

We develop design and working documentation in a single information model with clash control and coordinate solutions with stakeholders.

04

Expert review

We support the project through the state comprehensive expert review until a positive conclusion is issued and hand over the documentation package to the client.

Licence and regulatory framework

Category I

Design activities

GSL No. 007316

Issued 23.12.2019 · Urban Planning Control Department of Almaty

Open the licence (PDF) ↗
Design technologies

Design

Development of design and working documentation in the scope and order set by SN RK 1.02-03-2011: plan, longitudinal and cross sections, subgrade, pavement, drainage, structures, traffic management, utility networks.

SN RK 1.02-03-2011
Licensed software

The company holds licences for IndorCAD, Topomatic Robur and ABC-4.

IndorCADTopomatic RoburABC-4