Design activities
GSL No. 007316
Issued 23.12.2019 · Urban Planning Control Department of Almaty
Open the licence (PDF) ↗Service · 02
Integrated design of urban street networks, public squares and vehicle layover and turning areas. Site grading, vehicle and pedestrian connectivity, and improvements to adjoining areas.
Projects with positive expert review conclusions: 22.
| No. | Project | Year | City | Level | Expert review conclusion |
|---|---|---|---|---|---|
| 01 | Street construction in the Yugo-Vostok neighbourhood (left side), Phase 2 | 2020 | Astana | II | 01-0464/20 dated 30.09.2020 |
| 02 | Construction of Saryn Street from Zhumabayev Street to Street No. 44. Design revision | 2021 | Astana | I | 01-0408/21 dated 29.07.2021 |
| 03 | Street construction within the EK-32–EK-9 street block, Yesil District | 2022 | Astana | II | 01-0261/22 dated 10.06.2022 |
| 04 | Construction of Zhangildin Street from Kumisbekov Street to Sh. Beisekova Street. Design revision | 2022 | Astana | I | 01-0654/22 dated 15.12.2022 |
| 05 | Street construction in the Yugo-Vostok neighbourhood (initial section), Phase 1. Design revision | 2022 | Astana | II | 01-0676/22 dated 26.12.2022 |
| 06 | Street construction in the Yugo-Vostok neighbourhood (left side), Phase 2. Design revision | 2023 | Astana | II | 01-0088/23 dated 03.03.2023 |
| 07 | Yugo-Vostok neighbourhood (left side), Phase 2, Commissioning Package 1. Cost estimate revision | 2023 | Astana | II | 01-0169/23 dated 02.05.2023 |
| 08 | Yugo-Vostok neighbourhood (left side), Phase 2, Commissioning Package 2. Cost estimate revision | 2023 | Astana | II | 01-0170/23 dated 02.05.2023 |
| 09 | Street construction from Kabanbai Batyr Avenue to Turan Avenue | 2024 | Astana | II | 01-0452/24 dated 10.10.2024 |
| 10 | Construction of Orenburgskaya Street from N. Tlendiyev Avenue to Novaya Street. Completion of construction | 2024 | Astana | II | 01-0565/24 dated 19.12.2024 |
| 11 | Komsomolsky residential area, Phase 4, Section 1, Streets E355, E32 and E489. Completion of construction | 2025 | Astana | II | 01-0224/25 dated 23.06.2025 |
| 12 | Bus layover and turning area in the Boraldai neighbourhood, Alatau District | 2025 | Almaty | II | ПЭА-0013/25 dated 29.10.2025 |
| 13 | Bus layover and turning area on Burundaiskaya Street, Karasu neighbourhood, Alatau District | 2025 | Almaty | II | ПЭА-0015/25 dated 20.11.2025 |
| 14 | Bus layover and turning area north of Kaiyndy Street, Shuakty neighbourhood, Turksib District | 2025 | Almaty | II | ПЭА-0018/25 dated 29.12.2025 |
| 15 | Bus layover and turning area on Degdar Street, Turksib District | 2026 | Almaty | II | PREXAL-0001/26 dated 30.01.2026 |
| 16 | Street construction near the intersection of Turan Avenue, Uly Dala Avenue and Hussein bin Talal Street, Commissioning Package 1 | 2026 | Astana | I | 01-0123/26 dated 17.04.2026 |
| 17 | Bus layover and turning area in the Almerek neighbourhood, Turksib District | 2026 | Almaty | II | PREXAL-0004/26 dated 06.05.2026 |
| 18 | Bus layover and turning area east of Severnoye Koltso Street, Zhetysu District | 2026 | Almaty | II | PREXAL-0011/26 dated 22.05.2026 |
| 19 | Street construction near the Karkaraly Highway, Yesil District, Phase 1 | 2026 | Astana | I | 01-1042/26 dated 29.05.2026 |
| 20 | Bus layover and turning area in the Ozhet neighbourhood, Alatau District | 2026 | Almaty | II | PREXAL-0013/26 dated 04.06.2026 |
| 21 | Construction of Street No. 38 from F. Ongarsynova Street to Hussein bin Talal Street | 2026 | Astana | I | 01-1058/26 dated 09.06.2026 |
| 22 | Construction of Zhangildin Street from Kumisbekov Street to Sh. Beisekova Street. Design Revision No. 2 | 2026 | Astana | I | 01-1075/26 dated 19.06.2026 |
Project titles are abbreviated and translated for reference. Conclusion numbers and dates are taken from the company portfolio.
How we work
We receive the design brief, permits and technical conditions, analyse the available materials and define the scope of work.
We carry out geodetic, geotechnical and hydrometeorological surveys and inspect existing structures and utilities.
We develop design and working documentation in a single information model with clash control and coordinate solutions with stakeholders.
We support the project through the state comprehensive expert review until a positive conclusion is issued and hand over the documentation package to the client.
GSL No. 007316
Issued 23.12.2019 · Urban Planning Control Department of Almaty
Open the licence (PDF) ↗Development of design and working documentation in the scope and order set by SN RK 1.02-03-2011: plan, longitudinal and cross sections, subgrade, pavement, drainage, structures, traffic management, utility networks.
SN RK 1.02-03-2011The company holds licences for IndorCAD, Topomatic Robur and ABC-4.
We will prepare a commercial proposal for survey and design work.