Urban street and arterial road design

Integrated design of urban street networks, public squares and vehicle layover and turning areas. Site grading, vehicle and pedestrian connectivity, and improvements to adjoining areas.

37projects with positive expert review
8Level I responsibility facilities
5cities in Kazakhstan

Scope of work

  • 01Urban street networks
  • 02Public squares
  • 03Vehicle layover and turning areas
  • 04Site grading
  • 05Vehicle and pedestrian connectivity
  • 06Improvements to adjoining areas

Completed projects in this field

Projects with positive expert review conclusions: 22.

No.ProjectYearCityLevelExpert review conclusion
01Street construction in the Yugo-Vostok neighbourhood (left side), Phase 22020AstanaII01-0464/20 dated 30.09.2020
02Construction of Saryn Street from Zhumabayev Street to Street No. 44. Design revision2021AstanaI01-0408/21 dated 29.07.2021
03Street construction within the EK-32–EK-9 street block, Yesil District2022AstanaII01-0261/22 dated 10.06.2022
04Construction of Zhangildin Street from Kumisbekov Street to Sh. Beisekova Street. Design revision2022AstanaI01-0654/22 dated 15.12.2022
05Street construction in the Yugo-Vostok neighbourhood (initial section), Phase 1. Design revision2022AstanaII01-0676/22 dated 26.12.2022
06Street construction in the Yugo-Vostok neighbourhood (left side), Phase 2. Design revision2023AstanaII01-0088/23 dated 03.03.2023
07Yugo-Vostok neighbourhood (left side), Phase 2, Commissioning Package 1. Cost estimate revision2023AstanaII01-0169/23 dated 02.05.2023
08Yugo-Vostok neighbourhood (left side), Phase 2, Commissioning Package 2. Cost estimate revision2023AstanaII01-0170/23 dated 02.05.2023
09Street construction from Kabanbai Batyr Avenue to Turan Avenue2024AstanaII01-0452/24 dated 10.10.2024
10Construction of Orenburgskaya Street from N. Tlendiyev Avenue to Novaya Street. Completion of construction2024AstanaII01-0565/24 dated 19.12.2024
11Komsomolsky residential area, Phase 4, Section 1, Streets E355, E32 and E489. Completion of construction2025AstanaII01-0224/25 dated 23.06.2025
12Bus layover and turning area in the Boraldai neighbourhood, Alatau District2025AlmatyIIПЭА-0013/25 dated 29.10.2025
13Bus layover and turning area on Burundaiskaya Street, Karasu neighbourhood, Alatau District2025AlmatyIIПЭА-0015/25 dated 20.11.2025
14Bus layover and turning area north of Kaiyndy Street, Shuakty neighbourhood, Turksib District2025AlmatyIIПЭА-0018/25 dated 29.12.2025
15Bus layover and turning area on Degdar Street, Turksib District2026AlmatyIIPREXAL-0001/26 dated 30.01.2026
16Street construction near the intersection of Turan Avenue, Uly Dala Avenue and Hussein bin Talal Street, Commissioning Package 12026AstanaI01-0123/26 dated 17.04.2026
17Bus layover and turning area in the Almerek neighbourhood, Turksib District2026AlmatyIIPREXAL-0004/26 dated 06.05.2026
18Bus layover and turning area east of Severnoye Koltso Street, Zhetysu District2026AlmatyIIPREXAL-0011/26 dated 22.05.2026
19Street construction near the Karkaraly Highway, Yesil District, Phase 12026AstanaI01-1042/26 dated 29.05.2026
20Bus layover and turning area in the Ozhet neighbourhood, Alatau District2026AlmatyIIPREXAL-0013/26 dated 04.06.2026
21Construction of Street No. 38 from F. Ongarsynova Street to Hussein bin Talal Street2026AstanaI01-1058/26 dated 09.06.2026
22Construction of Zhangildin Street from Kumisbekov Street to Sh. Beisekova Street. Design Revision No. 22026AstanaI01-1075/26 dated 19.06.2026

Project titles are abbreviated and translated for reference. Conclusion numbers and dates are taken from the company portfolio.

Register of all 37 projects

How we work

From input data collection to a positive expert review conclusion

01

Input data collection

We receive the design brief, permits and technical conditions, analyse the available materials and define the scope of work.

02

Engineering surveys and inspection

We carry out geodetic, geotechnical and hydrometeorological surveys and inspect existing structures and utilities.

03

Design and BIM

We develop design and working documentation in a single information model with clash control and coordinate solutions with stakeholders.

04

Expert review

We support the project through the state comprehensive expert review until a positive conclusion is issued and hand over the documentation package to the client.

Licence and regulatory framework

Category I

Design activities

GSL No. 007316

Issued 23.12.2019 · Urban Planning Control Department of Almaty

Open the licence (PDF) ↗
Design technologies

Design

Development of design and working documentation in the scope and order set by SN RK 1.02-03-2011: plan, longitudinal and cross sections, subgrade, pavement, drainage, structures, traffic management, utility networks.

SN RK 1.02-03-2011
Licensed software

The company holds licences for IndorCAD, Topomatic Robur and ABC-4.

IndorCADTopomatic RoburABC-4